Moye's Project
New Pier, Fixed Dock with Step down System, Seating Area, and Roof
* Pilings: There are marine grade wood pilings driven into the lake bed to support the frame of the pier, fixed dock, and seating area.
* Frame: The frame of the pier, fixed dock, and seating area consists of 2 x 8 pressured treated lumber fastened together with galvanized rust resistant bolts.
* Decking: Khaki colored Veka Pro decking is fastened down with the stainless steel screws.
* Handrail Posts and Handrails: 6 x 6 pressure treated handrail posts where through bolted to the side of the frame on the pier with galvanized bolts on one side. The posts have khaki colored vinyl post sleeves with vinyl post caps, vinyl top and bottom rail with pickets.
* Fixed Dock Roof: Stick built hip roof secured by marine grade wood pilings. The roof consists of 2 x 8 pressure treated lumber, Spruce pine lumber, 1 x 4 dead wood, and a mixture of 2 x 4 and 2 x 6 pressure treated lumber. Roofing installed is Tin. Fascia board on the roof is the khaki colored Veka decking.